| 2020/03/10 |
|
PCN(Product Change Notice)
|
JSCC capacity increase - for listed products [Old] Silver wire bonding
[New] Silver wire bonding Gold wire bonding |
| 2020/06/12 |
|
PCN(Product Change Notice)
|
For StatsChipPAC JSCC Jiangyin China capacity increase Silver wire bonding > Silver wire bonding + Gold wire bonding |
| 2021/01/08 |
|
PCN(Product Change Notice)
|
PRODUCT / PROCESS CHANGE INFORMATION MBB (Material Barrier Bag) : extend print out warning message on shelf life Type of change: Any indirect material modifications for shipping products in dimensions, material, composition, orientation… (OLD) Due to historical reasons, the MBB ST is providing for SMD (Surface Mount Device) products have printed advise message alerting on 12 months of shelf life in sealed bags. (NEW) To align with extended shelf life International trends, the print out advise message for SMD products and in any case all products packed with MBB will be changed alerting on 24 months of shelf life in sealed bags. |
| 2021/07/29 |
|
PCN(Product Change Notice)
|
Die redesign: Mask or mask set change with new die design - Design changes in active elements. Manufacturing Location TSMC Fab14 (Taiwan)/ Crolles (France)
Old Current Die revision: - STM32F46X 1MB rev2 (Cut 1.3) in ST Crolles CRL300 (France) - STM32F46X 1MB rev4 (Cut 1.3) in TSMC Fab14 (Taiwan) Current RM0090 Rev 8 - Reference Manual STM32F405/415, STM32F407/417, STM32F427/437 and STM32F429/439 advanced ArmR-based 32-bit MCUs
New New Die Revision to improve manufacturing efficiency: - STM32F46X 1MB rev6 (Cut 1.4) in ST Crolles CRL300 (France) - STM32F46X 1MB rev5 (Cut 1.4) in TSMC Fab14 (Taiwan) New RM0090 Rev 19 - Reference Manual - february 2021 STM32F405/415, STM32F407/417, STM32F427/437 and STM32F429/439 advanced ArmR-based 32-bit MCUs
Timing / schedule Date of qualification results 2021-05-14 Intended start of delivery 2021-12-22 |
| 2021/08/30 |
|
PCN(Product Change Notice)
|
- Specification Change OLD Refer to application Note AN2606 version 48.0 April 2021 : - STM32F40xxx/41xxx devices in WLCSP90 package have Bootloader version V9.0. - STM32F40xxx/41xxx devices in all other packages have Bootloader version V3.1.
NEW Refer to application Note AN2606 version 49.0 July 2021 : - All STM32F40xxx/41xxx devices in any package with new BootLoader version V9.1 |
| 2021/08/30 |
|
PCN(Product Change Notice)
|
STM32F46X 1MB product BootLoader improvement Product Category: STM32F46X 1MB Issue date 2021-07-13 Description Old Refer to application Note AN2606 version 48.0 April 2021 : - STM32F40xxx/41xxx devices in WLCSP90 package have Bootloader version V9.0. - STM32F40xxx/41xxx devices in all other packages have Bootloader version V3.1.
New Refer to application Note AN2606 version 49.0 July 2021 : - All STM32F40xxx/41xxx devices in any package with new BootLoader version V9.1
Intended start of delivery 2021-08-30 |
| 2021/08/30 |
|
PCN(Product Change Notice)
|
Specification Change STM32F46X 1MB product BootLoader improvement Description Refer to application Note AN2606 version 49.0 July 2021 - All STM32F40xxx/41xxx devices in any package with new BootLoader version V9.1 Intended start of delivery 2021-08-30 |
| 2021/12/22 |
|
PCN(Product Change Notice)
|
Die redesign: Mask or mask set change with new die design - Design changes in active elements.
Description of change: OLD: Current Die revision: - STM32F46X 1MB rev2 (Cut 1.3) in ST Crolles CRL300 (France) - STM32F46X 1MB rev4 (Cut 1.3) in TSMC Fab14 (Taiwan) Current RM0090 Rev 8 - Reference Manual STM32F405/415, STM32F407/417, STM32F427/437 and STM32F429/439 advanced ArmR-based 32-bit MCUs. New: New Die Revision to improve manufacturing efficiency: - STM32F46X 1MB rev6 (Cut 1.4) in ST Crolles CRL300 (France) - STM32F46X 1MB rev5 (Cut 1.4) in TSMC Fab14 (Taiwan) New RM0090 Rev 19 - Reference Manual -february 2021 STM32F405/415, STM32F407/417, STM32F427/437 and STM32F429/439 advanced ArmR-based 32-bit MCUs
Intended start of delivery 2021-12-22 |
| 2024/08/22 |
|
PCN(Product Change Notice)
|
Old: Marking composition with no 2D marking New: New marking composition with 2D marking for production assembly
Timing / schedule Intended start of delivery : 2024-09-02 |
| 2024/08/28 |
|
PCN(Product Change Notice)
|
Description of change Old: Marking composition with no 2D marking New: New marking composition with 2D marking for production assembly
Timing / schedule Intended start of delivery 2024-09-02 |
| 2024/12/04 |
|
PCN(Product Change Notice)
|
Supplier Notice No.:MICROCONTROLLERS/24/15033 Title: JSCC (China) Enhanced traceability with 2D marking for LQFP7x7, LQFP10x10, LQFP12x12 list of products
Description of change: Old/ Marking composition with no 2D marking New/ New marking composition with 2D marking for production assembly
Anticipated Impact on form,fit,function, quality, reliability or processability? Form: Change is visible on marking area Fit : No change Function : No change Reliability : No change Processability : No change
Intended start of delivery: 2024-12-04
Intended start of delivery 2024-12-04 |
| 2024/12/04 |
|
PCN(Product Change Notice)
|
JSCC (China) Enhanced traceability with 2D marking for LQFP7x7, LQFP10x10, LQFP12x12 list of products |
| 2025/02/03 |
|
PCN(Product Change Notice)
|
Supplier Notice No.:PCN MDG/24/14976 Title: JSCC (China) LQFP7x7 48L , LQFP10x10 64L package copper palladium bonding wire introduction on STM32F2x, STM32F4x and STM32F7x listed products
Description: Old/ Current Wire bonding material: - JSCC (China) Gold wire or Silver wire - AMKOR ATP (Philippines) gold wire - ASE Kaohsiung (Taiwan) Gold wire or Copper Palladium wire
New/ Current Wire bonding material: - JSCC (China) Gold wire or Silver wire - AMKOR ATP (Philippines) gold wire - ASE Kaohsiung (Taiwan) Gold wire or Copper Palladium wire Added Wire bonding material : - JSCC (China) Copper Palladium wire
Anticipated Impact on form,fit,function, quality, reliability or processability? no impact on form, Fit, Function
Intended start of delivery: 2025-02-03 |
| 2025/05/20 |
|
PCN(Product Change Notice)
|
ASE KaoHsiung (Taiwan) additional source for legacy STM32F2x, STM32F4x and STM32F7x Description of change
Old Current assembly sites (depending on package/product): - ST Muar (Malaysia) Silver wire for Crolles & TSMC Dice, - AMKOR ATP (Philippine) Gold for Crolles, TSMC & Rousset Dice, - AMKOR ATP (Philippine) Copper Palladium wire for Crolles, TSMC Dice, - ASE Kaohsiung (Taiwan) Gold wire for Crolles, TSMC & Rousset Dice, - ASE Kaohsiung (Taiwan) Copper Palladium wire for Crolles & TSMC Dice, - JSCC (China) Gold for Crolles, TSMC & Rousset Dice, - JSCC (China) Copper Palladium wire for Crolles, TSMC Dice. You may refer to 15271_Additional information.pdf document for further details.
New Current assembly sites: (depending on package/product): - ST Muar (Malaysia) Silver wire for Crolles & TSMC Dice, - AMKOR ATP (Philippine) Gold for Crolles, TSMC & Rousset Dice, - AMKOR ATP (Philippine) Copper Palladium wire for Crolles, TSMC Dice, - ASE Kaohsiung (Taiwan) Gold wire for Crolles, TSMC & Rousset Dice, - ASE Kaohsiung (Taiwan) Copper Palladium wire for Crolles & TSMC Dice, - JSCC (China) Gold for Crolles, TSMC & Rousset Dice, - JSCC (China) Copper Palladium wire for Crolles, TSMC Dice. Additional assembly site for extended capacity: - ASE Kaohsiung (Taiwan) Copper Palladium wire for Rousset Dice.
|
| 2025/07/03 |
|
PCN(Product Change Notice)
|
PCN No.:MICROCONTROLLERS/25/15246 Change Desc.:Generic communication - Enhanced traceability with 2D marking for STM32 and STM8 listed products(3/3)
old/ Marking composition with no 2D marking
New/ New marking composition with 2D marking for production assembly |
| 2025/07/18 |
|
PCN(Product Change Notice)
|
PCN No. CRP/25/15294 Change Desc. Additional 2D in ST Standard Inner Bulk Label (MDRF perimeter)
Timing / schedule Intended start of delivery 2025-08-18 |
| 2025/12/15 |
|
PCN(Product Change Notice)
|
PCN No.:EMBEDDED PROCESSING/25/15423 Change Desc.:JSCC (China) additional source for legacy STM32F2x and STM32F4x listed products in LQFP 10x10 64L package
Intended start of delivery: 2025-12-15 |