| 2020/11/14 |
|
PCN(Product Change Notice)
|
STM32G43x, STM32G44x, STM32G47x, STM32G48x & STM32G49x, STM32G4Ax product enhancement Type of change:Die redesign : Mask or mask set change with new die design like metallization (specifically chip frontside) or bug fix |
| 2021/01/08 |
|
PCN(Product Change Notice)
|
PRODUCT / PROCESS CHANGE INFORMATION MBB (Material Barrier Bag) : extend print out warning message on shelf life Type of change: Any indirect material modifications for shipping products in dimensions, material, composition, orientation… (OLD) Due to historical reasons, the MBB ST is providing for SMD (Surface Mount Device) products have printed advise message alerting on 12 months of shelf life in sealed bags. (NEW) To align with extended shelf life International trends, the print out advise message for SMD products and in any case all products packed with MBB will be changed alerting on 24 months of shelf life in sealed bags. |
| 2021/04/08 |
|
PCN(Product Change Notice)
|
Old : Back-end sources - Amkor ATP Philippines New : Back-end sources - Amkor ATP Philippines, ASE Kaohsiung Taiwan < Additional source |
| 2022/05/08 |
|
PCN(Product Change Notice)
|
NEW DISTRIBUTION CENTER Notification related to 2nd EMEA DC project in Frankfurt Timing / schedule Intended start of delivery 2022-05-08 |
| 2023/09/13 |
|
PCN(Product Change Notice)
|
ASE KaoHsiung (Taiwan) LQFP 100 14x14 package copper palladium bonding wire introduction on STM32H74x, STM32H75x, STM32G47x and STM32G48x
Old Back-end source: - AMKOR ATP (Philippines) gold wire New Back-end source: - AMKOR ATP (Philippines) gold wire - ASE KaoHsiung (Taiwan) copper palladium wire - additional source
Timing / schedule Intended start of delivery 2023-10-05 |
| 2024/09/10 |
|
PCN(Product Change Notice)
|
Description of change Old Current assembly sites: - ASE Kaohsiung (Taiwan) Gold wire & Copper Palladium wire - AMKOR ATP (Philippine) Gold wire & Copper Palladium wire New Current assembly site: - ASE Kaohsiung (Taiwan) Gold wire & Copper Palladium wire - AMKOR ATP (Philippine) Gold wire & Copper Palladium wire Additional assembly site for extended capacity: - ST Muar (Malaysia) Copper Alloy wire
Timing / schedule Intended start of delivery 2024-12-16 |
| 2025/02/28 |
|
PCN(Product Change Notice)
|
ST Crolles (France) additional source for STM32G41x/G47x/G48x, STM32L43x/L44x/L4Zx and STM32L47x/L48x products in M10/90nm technology. |
| 2025/07/03 |
|
PCN(Product Change Notice)
|
PCN No.:MICROCONTROLLERS/25/15246 Change Desc.:Generic communication - Enhanced traceability with 2D marking for STM32 and STM8 listed products(3/3)
old/ Marking composition with no 2D marking
New/ New marking composition with 2D marking for production assembly |