| 2021/12/05 |
|
PCN(Product Change Notice)
|
Laser Mark Conversion for 12-Lead MSOP Packages Assembled in ADPG and UTAC Revision Description: Adding additional parts. Effectivity Date: 03-Sep-2021 |
| 2024/06/05 |
|
PCN(Product Change Notice)
|
Epoxy formulation changefrom Henkel 8290 to Henkel 8290A. 8290A is a more robust epoxy with minimal outgassing due to its less volatile fluorocarbon content. |
| 2025/05/19 |
|
PCN(Product Change Notice)
|
Supplier Notice No.:PCN 25_0016 (Rev -) Title: Bond Wire Change from Gold to Copper Wire (Notification Only)
Description Of Change: Change of bond wire from Gold to Copper wire for LFCSP/SO/TSSOP/TSOT/SC70 pkg family built in UTAC (Thailand). LFCSP BOM will be changed from Sumitomo G770HCD/ Albestik8200 to Sumitomo G700/Ablestik8600. TSSOP Die attach will be changed from Ablestik8200 to Atrox 558. All materials have qualified and in production for ADI devices.
Reason For Change: The conversion to Cu wire aligns with industry trend and ADI current and future corporate directives.
Impact of the change (positive or negative) on fit, form, function & reliability: This change has no impact on fit, form, function & reliability.
Effectivity Date: 19-May-2025 (the earliest date that a customer could expect to receive changed material) |
| 2025/05/19 |
|
PCN(Product Change Notice)
|
Supplier Notice No.:PCN 25_0016 Rev. - Title: Bond Wire Change from Gold to Copper Wire (Notification Only)
Description Of Change: Change of bond wire from Gold to Copper wire for LFCSP/SO/TSSOP/TSOT/SC70 pkg family built in UTAC (Thailand). LFCSP BOM will be changed from Sumitomo G770HCD/ Albestik8200 to Sumitomo G700/Ablestik8600. TSSOP Die attach will be changed from Ablestik8200 to Atrox 558. All materials have qualified and in production for ADI devices.
Reason For Change: The conversion to Cu wire aligns with industry trend and ADI current and future corporate directives.
Impact of the change (positive or negative) on fit, form, function & reliability: This change has no impact on fit, form, function & reliability.
Effectivity Date: 19-May-2025 (the earliest date that a customer could expect to receive changed material) |
| 2025/07/12 |
|
PCN(Product Change Notice)
|
Bond Wire Change from Gold to Copper Wire (Revision Description: Removing ADEF and Auto parts) |