| 2021/01/08 |
|
PCN(Product Change Notice)
|
PRODUCT / PROCESS CHANGE INFORMATION MBB (Material Barrier Bag) : extend print out warning message on shelf life Type of change: Any indirect material modifications for shipping products in dimensions, material, composition, orientation… (OLD) Due to historical reasons, the MBB ST is providing for SMD (Surface Mount Device) products have printed advise message alerting on 12 months of shelf life in sealed bags. (NEW) To align with extended shelf life International trends, the print out advise message for SMD products and in any case all products packed with MBB will be changed alerting on 24 months of shelf life in sealed bags. |
| 2021/11/26 |
|
PDN(Product Discontinuation Notice)
|
STM8A Automotive product - End of Life |
| 2022/05/20 |
|
PCN(Product Change Notice)
|
ST MUAR ? Qualification of ARTEAC Flow for Selected STM8A Products Old: Test Program without ARTEAC flow for Automotive product performs Quality Control (QC) after Final Test (FT). New: Adding ARTEAC flow capability. Depending on test platform, test program for automotive products performs : - Either standard quality control (QC) after final test (FT) - Or new ARTEAC (automated real time electrical and audit control) test flow
Intended start of delivery 2022-05-20 |
| 2023/03/20 |
|
PCN(Product Change Notice)
|
ST Muar (Malaysia) Additional capacity through High Density Leadframe
Timing / schedule Intended start of delivery 2023-03-20 |
| 2023/07/03 |
|
PCN(Product Change Notice)
|
Implementation of a PBO (Polybenzoxazole) protective layer over product passivation for STM8A (AUTOMOTIVE) listed products
Old: The wafer passivation layer has no protective layer. New: Implementation of a PBO (Polybenzoxazole) protective layer on top of the wafer passivation layer is proposed to customer.
Timing / schedule Intended start of delivery 2023-09-07 |
| 2025/07/18 |
|
PCN(Product Change Notice)
|
PCN No. CRP/25/15294 Change Desc. Additional 2D in ST Standard Inner Bulk Label (MDRF perimeter)
Timing / schedule Intended start of delivery 2025-08-18 |