| 2022/08/15 |
|
PCN(Product Change Notice)
|
STM32G0B0x, STM32G0B1x and STM32G0C1x 512K - product enhancement Intended start of delivery 2022-08-15 |
| 2024/04/15 |
|
PCN(Product Change Notice)
|
Description of change Old Current Wire bonding material: - JSCC (China) Gold wire or Silver wire - ASE Kaohsiung (Taiwan) Gold wire or Copper Palladium wire New Current Wire bonding material: - JSCC (China) Gold wire or Silver wire - ASE Kaohsiung (Taiwan) Gold wire or Copper Palladium wire Added Wire bonding material : - JSCC (China) Copper Palladium wire
Timing / schedule Intended start of delivery 2024-06-30 |
| 2024/06/30 |
|
PCN(Product Change Notice)
|
Supplier Notice No.:MDG/24/14363 Title: JJSCC (China) LQFP7x7 32L/48L , LQFP10x10 64L and LQFP12x12 80L package copper palladium bonding wire introduction on STM32C0x, STM32G0/G4x, STM32H5/H7x, STM32L4/L5x and STM32U5x listed products
Description of change: Old Current Wire bonding material: - JSCC (China) Gold wire or Silver wire - ASE Kaohsiung (Taiwan) Gold wire or Copper Palladium wire
New Current Wire bonding material: - JSCC (China) Gold wire or Silver wire - ASE Kaohsiung (Taiwan) Gold wire or Copper Palladium wire
Added Wire bonding material : - JSCC (China) Copper Palladium wire
Anticipated Impact on form,fit,function, quality, reliability orprocessability? no impact on form, Fit, Function
Intended start of delivery: 2024-06-30 |
| 2024/07/23 |
|
PCN(Product Change Notice)
|
Old: Front-end sources for die 460 cut2.1 / die 467 cut 1.1 - TSMC (Taiwan) FAB14 New: Front-end sources for die 460 cut2.1 / die 467 Cut 1.1 - TSMC (Taiwan) FAB14 - Crolles 300 ( France) additional source
Timing / schedule Intended start of delivery 2024-09-13 |
| 2024/12/04 |
|
PCN(Product Change Notice)
|
Supplier Notice No.:MICROCONTROLLERS/24/15033 Title: JSCC (China) Enhanced traceability with 2D marking for LQFP7x7, LQFP10x10, LQFP12x12 list of products
Description of change: Old/ Marking composition with no 2D marking New/ New marking composition with 2D marking for production assembly
Anticipated Impact on form,fit,function, quality, reliability or processability? Form: Change is visible on marking area Fit : No change Function : No change Reliability : No change Processability : No change
Intended start of delivery: 2024-12-04
Intended start of delivery 2024-12-04 |
| 2024/12/04 |
|
PCN(Product Change Notice)
|
JSCC (China) Enhanced traceability with 2D marking for LQFP7x7, LQFP10x10, LQFP12x12 list of products |