| 2021/12/20 |
|
PCN(Product Change Notice)
|
STM32F209 1Mb product improvement Description of change Old Current die revision: - STM32F209 1MB rev2 (Cut 2.4) in ST Crolles CRL300 (France) - STM32F209 1MB rev3 (Cut 2.5) in TSMC Fab14 (Taiwan) Current RM0033 Rev 8 - Reference Manual STM32F205xx, STM32F207xx, STM32F215xx and STM32F217xx advanced Arm-based 32-bit MCUs New New die revision to improve manufacturing efficiency: - STM32F209 1MB rev5 (Cut 2.6) in ST Crolles CRL300 (France) - STM32F209 1MB rev4 (Cut 2.6) in TSMC Fab14 (Taiwan) New RM0033 Rev 9 - Reference Manual - february 2021 STM32F205xx, STM32F207xx, STM32F215xx and STM32F217xx advanced Arm-based 32-bit MCUs
Anticipated Impact on form,fit, function, quality, reliability or processability? No impact on Form, Fit or Function
Timing / schedule Date of qualification results 2021-05-14 Intended start of delivery 2021-12-20 |
| 2021/12/20 |
|
PCN(Product Change Notice)
|
Die redesign: Mask or mask set change with new die design - Design changes in active elements. Manufacturing Location: TSMC Fab14 (Taiwan)/ Crolles(France)
Current die revision: - STM32F209 1MB rev2 (Cut 2.4) in ST Crolles CRL300 (France) - STM32F209 1MB rev3 (Cut 2.5) in TSMC Fab14 (Taiwan) Current RM0033 Rev 8 - Reference Manual STM32F205xx, STM32F207xx, STM32F215xx and STM32F217xx advanced Arm-based 32-bit MCUs
New die revision to improve manufacturing efficiency: - STM32F209 1MB rev5 (Cut 2.6) in ST Crolles CRL300 (France) - STM32F209 1MB rev4 (Cut 2.6) in TSMC Fab14 (Taiwan) New RM0033 Rev 9 - Reference Manual - february 2021 STM32F205xx, STM32F207xx, STM32F215xx and STM32F217xx advanced Arm-based 32-bit MCUs
Timing / schedule Date of qualification results 2021-05-14 Intended start of delivery 2021-12-20 |
| 2022/04/24 |
|
PCN(Product Change Notice)
|
Setup of a 2nd EMEA DC in Frankfurt for closer deliveries to customers in Germany & Eastern Europe. The change also includes personnel, location, logistic model.. |
| 2022/05/08 |
|
PCN(Product Change Notice)
|
NEW DISTRIBUTION CENTER Notification related to 2nd EMEA DC project in Frankfurt Timing / schedule Intended start of delivery 2022-05-08 |
| 2022/05/15 |
|
PCN(Product Change Notice)
|
Notification related for 2nd EMEA DC project in Frankfurt |