Chip One Stop - Shopping Site for Electronic Components and Semiconductors
Menu
Australia
Change
English
SELECT YOUR LANGUAGE
USD
SELECT YOUR CURRENCY FOR DISPLAY
关于优惠等级和折扣率

目前的商品价格将适用于以下


・根据顾客的购买情况可以享受优惠和折扣
・关于折扣仅限于从本网站直接下单的订单
・部分产品和阶梯数量不被包含在优惠折扣产品中
・关于优惠等级的详细信息请联系您的销售人员
・不能与其它优惠同时使用

PCN/PDN/NRND信息

PCN(产品/工艺变更通知)和PDN(生产中断通知)信息。

通知日期 通知文书 通知类型 通知信息
2023/04/04 PCN(产品规格变更通知) Release of Business Group Bipolar Discretes QPortfolio Wave 4
Effective date: 04 Apr 2023
2024/01/07 PCN(产品规格变更通知) Introduction of new carrier tape material in SOT23
A new surface material for carrier tapes for the package SOT23 will be introduced as second source:
Polystyrene (PS) in addition to Polycarbonate (PC).
The cover tape material will remain unchanged.

Since there are many applicable products, this notification is divided into individual notifications.
Depending on your company's purchase history, you may receive multiple notifications.
Please be aware.
2024/06/15 PCN(产品规格变更通知) Nexperia changes the finished goods label, this includes: - Readable text~orderable part number (OPN) on SPQ and PQ labels, (34P) - 2D matrix code on SPQ~label, embedded with packing unit identifier (PUID) data - Replace (31D) Redate~by (32D) Date1 for new re-date code definition - QR code on PQ label (for~internal use mainly)
* Since there are many applicable products, this notification is divided and notified. Therefore, depending on your purchase history, notifications may be sent in multiple notifications, but the following notifications will all be the same.
Our notification number: PP0000735569 / PP0000735597
2024/10/21 PCN(产品规格变更通知) Supplier Notice No.:CN-202407002F
Title:
Introduction of Cu-wire for ESD protection devices in SOT23 (Part 1)

Details of this change:
Scheduled changes affect ESD protection devices in SOT23. These include: - Bond wire material will be changed from gold (Au) to copper (Cu). - 200mm wafers will be introduced as replacement for the currently released 150mm wafers. Additionally a new die design and improved back side metallization will be implemented.

Impact:
No impact to the product's functionality anticipated

Planned first shipment:
21 Oct 2024
请点击这里进行最后的购买咨询
PCN/PDN/NRND信息
通知类型
通知信息
通知日期
通知产品
制造商 制造商零件编号 最后购买时间 后继产品

通知产品的产品信息

   12345  最后  下1页
相关结果:4,377 件中 / 1~25现在显示






   12345  最后  下1页
相关结果:4,377 件中 / 1~25现在显示