| 2020/06/09 |
|
PCN(产品规格变更通知)
|
AMS330LHHTR : new self-test limits at FT and datasheet update. |
| 2020/09/30 |
|
PCN(产品规格变更通知)
|
PRODUCT / PROCESS CHANGE INFORMATION ASM330LHHTR, KIT330LHHTR: Testing Transfer from ST Castelletto to ST Malta (same equipment model). |
| 2021/01/08 |
|
PCN(产品规格变更通知)
|
MBB (Material Barrier Bag) : extend print out warning message on shelf life Type of Change: Any indirect material modifications for shipping products in dimensions, material, composition, orientation… (OLD) Due to historical reasons, the MBB ST is providing for SMD (Surface Mount Device) products have printed advise message alerting on 12 months of shelf life in sealed bags. (NEW) To align with extended shelf life International trends, the print out advise message for SMD products and in any case all products packed with MBB will be changed alerting on 24 months of shelf life in sealed bags.
|
| 2021/08/06 |
|
PCN(产品规格变更通知)
|
Change of EWS test platform from C372 to DOT 100 on the selected products. Issue date 2021-07-27
Description Old: EWS test platform: SPEA C372. New: EWS test platform: SPEA DOT 100. Motivation C372 are old models as EWS Test Platform and are no more properly supported by suppliers.
Timing / schedule Date of qualification results 2021-06-25 Intended start of delivery 2021-10-11 |
| 2021/10/07 |
|
PCN(产品规格变更通知)
|
GLWO Labeling and Printing Rollout Project (Category 1 label design enhancement) Description of change Old Due to the technical limitation of the printing solution, customized Labels containing a 2D barcode using the QR code format is printing an extra text line which is displaying the QR code contents. This is extra text line is not requested and is not used by the customer. New The customized labels will be printed using the new labelling printing application. The customized labels pasted on the inner boxes or outer boxes that are using the QR codes format will no longer contain an extra text line. The sequence of information and fields remain the same with respect to customer specifications. |
| 2022/04/14 |
|
PCN(产品规格变更通知)
|
APPLICATION NOTE AN5296 UPDATE for ASM330LHHTR |
| 2022/04/22 |
|
PCN(产品规格变更通知)
|
ST Rousset as additional FE plant for the following products: ASM330LHHTR, KIT330LHHTR.
Description of change Old: ST Crolles as FE plant New: ST Rousset as additional FE plant
Timing / schedule Intended start of delivery 2022-04-22 |
| 2022/04/24 |
|
PCN(产品规格变更通知)
|
Setup of a 2nd EMEA DC in Frankfurt for closer deliveries to customers in Germany & Eastern Europe. The change also includes personnel, location, logistic model.. |
| 2022/05/08 |
|
PCN(产品规格变更通知)
|
Notification related to 2nd EMEA DC project in Frankfurt Timing / schedule Intended start of delivery 2022-05-08 |
| 2022/05/08 |
|
PCN(产品规格变更通知)
|
Notification related to 2nd EMEA DC project in Frankfurt
Timing / schedule Intended start of delivery 2022-05-08 |
| 2022/05/13 |
|
PCN(产品规格变更通知)
|
APPLICATION NOTE (AN5296) UPDATE for ASM330LHHTR and KIT330LHHTR. Description of change Old: Start up procedure not included in Application Note (AN5296) New: Start up procedure included in Application Note (AN5296/ section 3) Timing / schedule Intended start of delivery 2022-05-13 |
| 2022/05/15 |
|
PCN(产品规格变更通知)
|
Notification related for 2nd EMEA DC project in Frankfurt |
| 2024/01/27 |
|
PCN(产品规格变更通知)
|
MBB (Material Barrier Bag) : extend print out warning message on shelf life |
| 2024/01/29 |
|
PCN(产品规格变更通知)
|
Description Old: Assembly and Testing in Malta. New: Assembly and Testing in Calamba.
Timing / schedule Intended start of delivery 2024-11-18 |
| 2024/11/18 |
|
PCN(产品规格变更通知)
|
Supplier Notice No.:AMS/24/14516 Title: ASM330LHHTR, KIT330LHHTR, ASM330LHMTR: Assy and Testing transfer to Calamba.
Description: Old/Assembly and Testing in Malta. New/Assembly and Testing in Calamba.
Motivation: Internal Assy and Testing lines relocation for manufacturing strategy optimization.
Intended start of delivery: 2024-11-18 |
| 2025/08/18 |
|
PCN(产品规格变更通知)
|
PCN No. CRP/25/15292 Change Desc. Additional 2D in ST Standard Inner Bulk Label (APMS perimeter)
Timing / schedule Intended start of delivery 2025-08-18 |
| 2026/05/29 |
|
PCN(产品规格变更通知)
|
Supplier Notice No.:CRP/25/15383 Title:(1/4)ST manufacturing reshaping program - Corporate PCI - Early Notification
Description of change: Old/ST manufacturing landscape New/Reshaping of ST’s manufacturing footprint by end 2027
Anticipated Impact on form,fit,function, quality, reliability or processability? Form : no impact Fit : no impact Function : no impact Reliability : no impact Processability : no impact
Intended start of delivery: 2026-05-29 |
| 2026/05/29 |
|
PCN(产品规格变更通知)
|
Supplier Notice No.:CRP/25/15383 Title:(1/4)ST manufacturing reshaping program - Corporate PCI - Early Notification
Description of change: Old/ST manufacturing landscape New/Reshaping of ST’s manufacturing footprint by end 2027
Anticipated Impact on form,fit,function, quality, reliability or processability? Form : no impact Fit : no impact Function : no impact Reliability : no impact Processability : no impact
Intended start of delivery: 2026-05-29 |
| 2027/12/24 |
|
PCN(产品规格变更通知)
|
PDN No.: ANALOG MEMS SENSORS/25/15592 Description: ST Manufacturing Reshaping (MEMS 4): Qualification of CR300 (FRANCE) for ASIC as new FE location and CROLLES (FRANCE) for ASIC and MEMS as new EWS Location. |
| 2027/12/24 |
|
PCN(产品规格变更通知)
|
PCN No.: SENSORS/25/15592 Description: ST Manufacturing Reshaping (MEMS 4): Qualification of CR300 (FRANCE) for ASIC~as new FE location and CROLLES (FRANCE) for ASIC and MEMS as new EWS Location. |