| 2023/12/11 |
|
PCN(产品规格变更通知)
|
Phase out of Kyocera KEG300 mold compound for several assembly locations and change of lead finish from tin dip to electro plating at Tijuana, Mexico for dedicated TO220-3 & TO247-3 products Reason To ensure continuity of mold compound supply due to Kyocera KEG300 end of life and to further ensure our product performance with lead-free electroplating finish Description Assembly materials:Mold compound Old: Kyocera KEG300 New: Sumitomo EME-E500 Assembly materials:Lead finish (Tijuana only) Old: Tin dip finish New: Lead-free electroplating finish
Intended start of delivery 2024-02-29 |
| 2024/02/29 |
|
PCN(产品规格变更通知)
|
Phase out of Kyocera KEG300 mold compound for several assembly locations and change of lead finish from tin dip to electro plating at Tijuana, Mexico for dedicated TO220-3 & TO247-3 products |
| 2024/10/11 |
|
PCN(产品规格变更通知)
|
Extension of assembly and final test sites for additional capacity to ensure the continuity of supply and flexible manufacturing Description New 1st OPN suffix digit - “X” (Halogen-free, RoHS compliant, Totally Lead-free) Full OPN e.g. IRFP90N20DPBFAKMA1 >> IRFP90N20DPBFXKMA1
Time schedule Intended start of delivery 2025-04-30 |
| 2024/11/21 |
|
PDN(产品停产通知)
|
Supplier Notice No.:PD_417_24 Title: Product discontinuation
Reason: Technology has reached end of life. |
| 2025/04/30 |
|
PCN(产品规格变更通知)
|
Supplier Notice No.:2024-099-A Title: Capacity extension for dedicated products in TO247 packages for assembly and final test location to Huayi Microelectronics, China.
Reason: Extension of assembly and final test sites for additional capacity to ensure the continuity of supply and flexible manufacturing
Description: Assembly & Final Test location/ Mould Compound/ 1st OPN suffix digit/ Old/ - “A” (Halogen-free, RoHS compliant, not Totally Lead-free) New/ - “X” (Halogen-free, RoHS compliant, Totally Lead-free)
Impact of change: No impact on electrical performance. No change in form, fit and function. Quality and reliability verified by qualification.
Intended start of delivery: 2025-04-30 |