| 2022/07/07 |
|
PCN (Product Change Notice)
|
Transfer of Assembly and Test operations of SMA, SMB and SMC products to~subcontractor Good-Ark China. |
| 2023/02/15 |
|
PDN(Product Discontinuation Notice)
|
Transfer of Assembly and Test operations of SMC products to subcontractor Good-Ark China. Description and Purpose: This Final Product Change Notification (FPCN) is to announce the planned qualification to transfer Assembly and Test of SMC products from onsemi Vietnam to subcontractor GoodArk China. The suffix ‘-GA01’ will be added to the end of the part number. |
| 2023/08/01 |
|
PCN (Product Change Notice)
|
Transfer of Assembly and Test operations of SMA, SMB and SMC products to subcontractor Good-Ark China. The suffix ‘-GA01’ will be added to the end of the part number. Proposed Changed Material First Ship Date: 01 Aug 2023 |
| 2023/09/07 |
|
PCN (Product Change Notice)
|
Description and Purpose: To consolidate wafer probe site from onsemi MYD (Lot 122, Senawang industrial Estate, Seremban, Malaysia) & onsemi ISMF (Lot 55, Senawang industrial Estate, Seremban, Malaysia) into sole onsemi ISMF(Lot55) for Schottky, Ultrafast, Zener, Bipolar, Filter, Compensating Rectifier, TSPD, FRD, MOSCAP and Small Signal Transistor devices. Effective date:07 Sep 2023 |
| 2024/09/17 |
|
EOL REVERSAL(Withdrawal of Product Discontinuation)
|
Supplier Notice No.:EPCN-354936 Title: SURS8340T3G is Active.
Description: Arrow Electronics received the following information from the manufacturer outside of their standard product change notification process. |
| 2025/09/21 |
|
PCN (Product Change Notice)
|
PDN No.: PB23483ZE Description: Dual Source Update for Assembly and Test Sites at GoodArk China. |
| 2025/10/19 |
|
PCN (Product Change Notice)
|
PCN No.:PB23483ZE1 Change Desc.:Indium Suzhou Factory Fire - Reactivating parts with alternative assembly and test site at onsemi Vietnam
Effective date: 19 Oct 2025 |
| 2025/10/19 |
|
EOL REVERSAL(Withdrawal of Product Discontinuation)
|
PCN No.:PB23483ZE1#1 Change Desc.:Indium Suzhou Factory Fire - Reactivating parts with alternative assembly and test site at onsemi Vietnam
Effective date: 19 Oct 2025 |